PRODUCT DISPLAY

Heavy equipment terminal

2019/07/09 11:20:38

Our company's Yangtze River heavy wharf set up three berths - 000DWT hoisting berth, 15000DWT fo-ro berth4000DW bulk berth, wharf length 709 meters. Our Yangtze River wharf pernial water depthis 15 meters, ann-ual design throughput is 138 million tons.

 Two 850-ton bridge cranes (34m) in nuclear and petrochemical plant will swing heavy parts to the berths. The har-bor surface width is 34 meters, the road surface width is 7 meters and the hook from the pier maximum distanceis 28 meters .Harbor water level perennial in 15 meters or more I no frozen period, with 50,000 tons of sea berths,has successfully completed the Yangzi Petrochemical Project, Shandong Zhenghe project , Qilu Petrochemical proj-ects and other multi-hydrogenation reactor shipments

Inner Harbor Pool consists of four 2.00 ton level berths, the operating platform is 390m long. The terminal is fullyequipped with a 13000m open storage ground. The harbor water surface is 30m wide, the port water level perenn-ial in-10m or more, no frozen period, with the capacity of river-road transport and transit







Prev:Welding and rolling capacity

Next:Group company smelting and forging capacity

Back